{"id":19259,"date":"2024-10-12T18:40:40","date_gmt":"2024-10-12T16:40:40","guid":{"rendered":"https:\/\/pmdoc.ua\/?p=19259"},"modified":"2025-11-24T17:27:48","modified_gmt":"2025-11-24T15:27:48","slug":"pmbok-4-6-3-3-cost-management-plan","status":"publish","type":"post","link":"https:\/\/pmdoc.ua\/en\/pmbok-4-6-3-3-cost-management-plan\/","title":{"rendered":"PMBOK 4.6.3.3 &#8220;Cost Management Plan&#8221;"},"content":{"rendered":"\n<p>New PMBOK.Kit template \u2013&nbsp;<strong>Cost Management Plan<\/strong>! Download it here:&nbsp;<a href=\"https:\/\/pmdoc.ua\/en\/product\/pmbok4633\">PMDoc.ua\/en\/product\/pmbok4632<\/a>.<\/p>\n\n\n\n<p>A <strong>Cost Management Plan<\/strong> is a component of a Program or&nbsp;<a href=\"https:\/\/pmdoc.ua\/en\/product\/pmbok4636\/\">Project Management Plan<\/a>&nbsp;that outlines how costs will be planned, structured, and controlled throughout the project. It includes the cost management processes and their associated tools and techniques. The plan typically specifies units of measure, levels of precision and accuracy, control thresholds, and rules for performance measurement among other details.<\/p>\n\n\n\n<p>Stay tuned for updates and tips on making the most of these templates:&nbsp;<a href=\"https:\/\/whatsapp.com\/channel\/0029VaraJs6LCoX75qJbsI2G\"><strong>whatsapp.com\/channel\/0029VaraJs6LCoX75qJbsI2G<\/strong><\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-pmdoc wp-block-embed-pmdoc\"><div class=\"wp-block-embed__wrapper\">\n<div class='avia-iframe-wrap'><blockquote class=\"wp-embedded-content\" data-secret=\"eHcjsyxMcb\"><a href=\"https:\/\/pmdoc.ua\/product\/pmbok4633\/\">\u041f\u041c\u0411\u041e\u041a 4.6.3.3 &#8220;\u041f\u043b\u0430\u043d \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f \u0432\u0430\u0440\u0442\u0456\u0441\u0442\u044e&#8221;<\/a><\/blockquote><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"&#8220;\u041f\u041c\u0411\u041e\u041a 4.6.3.3 &#8220;\u041f\u043b\u0430\u043d \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f \u0432\u0430\u0440\u0442\u0456\u0441\u0442\u044e&#8221;&#8221; &#8212; PMDoc\u2122\" src=\"https:\/\/pmdoc.ua\/product\/pmbok4633\/embed\/#?secret=JFO15hCSl1#?secret=eHcjsyxMcb\" data-secret=\"eHcjsyxMcb\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/div>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The new template of the PMBOK.Kit &#8211; Cost Management Plan that outlines how costs will be planned, structured, and controlled throughout the project.<\/p>\n","protected":false},"author":1,"featured_media":9197,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[345],"tags":[],"class_list":["post-19259","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/posts\/19259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/comments?post=19259"}],"version-history":[{"count":2,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/posts\/19259\/revisions"}],"predecessor-version":[{"id":19266,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/posts\/19259\/revisions\/19266"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/media\/9197"}],"wp:attachment":[{"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/media?parent=19259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/categories?post=19259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/tags?post=19259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}