{"id":14701,"date":"2022-03-26T19:36:40","date_gmt":"2022-03-26T17:36:40","guid":{"rendered":"https:\/\/pmdoc.ua\/product\/pmbok_kit_v7\/"},"modified":"2024-08-21T18:28:28","modified_gmt":"2024-08-21T16:28:28","slug":"pmbok_kit_v7","status":"publish","type":"product","link":"https:\/\/pmdoc.ua\/en\/product\/pmbok_kit_v7\/","title":{"rendered":"PMBOK.Kit.v7"},"content":{"rendered":"<p><a name=\"what_is\"><\/a><\/p>\n<h3>What is the PMBOK.Kit?<\/h3>\n<p>The PMBOK.Kit is a collection of templates designed for managing projects and establishing project management organizational standards. Utilizing the PMBOK.Kit templates can significantly streamline the administration of project documentation, enhance the quality of management documents, and save time.<\/p>\n<p>This comprehensive kit offers standardized templates for various management documents and artifacts. These templates can be customized to suit the specific needs of companies across diverse industries.<a href=\"https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-14815 size-medium\" src=\"https:\/\/pmdoc.ua\/wp-content\/uploads\/\/GPMS.Kit-v7.0-250x300.png\" alt=\"The GPMS.Kit v7.0 templates relationship diagram\" width=\"250\" height=\"300\" srcset=\"https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0-250x300.png 250w, https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0-858x1030.png 858w, https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0-67x80.png 67w, https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0-768x922.png 768w, https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0-600x720.png 600w, https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0-1280x1536.png 1280w, https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0-1707x2048.png 1707w, https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0-1250x1500.png 1250w, https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0-588x705.png 588w, https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0-407x488.png 407w\" sizes=\"auto, (max-width: 250px) 100vw, 250px\" \/><\/a><\/p>\n<p>To ensure consistent application across different sectors, the PMBOK.Kit is grounded in the widely recognized artifacts and performance domains detailed in the <a href=\"https:\/\/www.pmi.org\/pmbok-guide-standards\/foundational\/pmbok\">Guide to the Project Management Body of Knowledge and The Standard for Project Management (PMBOK<sup>\u00ae<\/sup> Guide, 7<small><sup>th<\/sup><\/small> edition)<\/a>. We have retained the terminology, designations, and titles from the PMBOK as closely as possible. Moreover, in the 7<small><sup>th<\/sup><\/small> edition of the PMBOK.Kit, we have aligned the template IDs with the section numbers of the PMBOK. This ensures that users can effortlessly reference the original information about PMBOK.Kit documents in the primary source.<\/p>\n<p>A diagram illustrating the correlation between PMBOK.Kit documents and the PMBOK&#8217;s artifact types and performance domains can be found <strong>on the right<\/strong>. This diagram is also available for download in both <a href=\"https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0.pdf\">PDF<\/a> and <a href=\"https:\/\/pmdoc.ua\/wp-content\/uploads\/GPMS.Kit-v7.0.xlsx\">Excel<\/a> formats.<\/p>\n<p><a name=\"how_to_use\"><\/a><\/p>\n<h3><strong>How to use the PMBOK.Kit?<\/strong><\/h3>\n<p>The PMBOK.Kit serves a range of specialists across different domains for the purposes outlined below:<\/p>\n<ol>\n<li><strong>Project Managers:<\/strong> They employ the PMBOK.Kit to streamline the processes of initiating, planning, executing, controlling, monitoring, and closing projects. This structure facilitates adherence to anticipated timelines and budgets.<a href=\"https:\/\/pmdoc.ua\/wp-content\/uploads\/gpms_usage_en.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-14713 size-full\" src=\"https:\/\/pmdoc.ua\/wp-content\/uploads\/gpms_usage_en.png\" alt=\"The purposes of using the GPMS by various specialists\" width=\"434\" height=\"361\" srcset=\"https:\/\/pmdoc.ua\/wp-content\/uploads\/gpms_usage_en.png 434w, https:\/\/pmdoc.ua\/wp-content\/uploads\/gpms_usage_en-300x250.png 300w, https:\/\/pmdoc.ua\/wp-content\/uploads\/gpms_usage_en-80x67.png 80w, https:\/\/pmdoc.ua\/wp-content\/uploads\/gpms_usage_en-407x339.png 407w\" sizes=\"auto, (max-width: 434px) 100vw, 434px\" \/><\/a><\/li>\n<li><strong>Department Heads:<\/strong> By adopting the kit, they can ensure a uniform approach to executing various projects and their components. This standardization not only amplifies the efficiency of project implementation but also fosters a consistent understanding of project documentation among diverse stakeholders.<\/li>\n<li><strong>Consultants:<\/strong> The PMBOK.Kit serves as a foundation when crafting Organization Project Management Standards for their clientele. This meets the demand for codifying project management principles and procedures.<\/li>\n<li><strong>Project Participants and Subject Matter Experts:<\/strong> These professionals rely on the kit&#8217;s templates for swift, seamless, and superior documentation of numerous project facets throughout its lifecycle.<\/li>\n<li><strong>Educators and Trainers:<\/strong> They integrate the PMBOK.Kit into their curriculum as resource materials for facilitating hands-on exercises and business simulations.<\/li>\n<li><strong>Students and Trainees:<\/strong> The kit offers them a tangible application of widely recognized artifacts and performance domains in project management. This immersive experience equips them with a profound comprehension of the project manager role, laying a strong foundation even during their educational phase.<\/li>\n<\/ol>\n<p><a name=\"structure\"><\/a><\/p>\n<h3>What is included in the PMBOK.Kit?<\/h3>\n<p><strong>What is included in the PMBOK.Kit?<\/strong><\/p>\n<p>The PMBOK.Kit comprises <a href=\"https:\/\/pmdoc.ua\/en\/product_cat\/packages\/gpms\/\">77 templates<\/a> for management documents, organized into sections based on the following intersecting areas:<\/p>\n<ul>\n<li><strong>Commonly Used Artifacts:<\/strong> This section provides template sets for nine types of PM artifacts, including:\n<ul>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/strategy-artifacts\/\">Strategy Artifacts<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/logs-and-registers\/\">Logs and Registers<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/ru\/product_tag\/plans\/\">Plans<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/hierarchy-charts\/\">Hierarchy Charts<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/baselines\/\">Baselines<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/visual-data-and-information\/\">Visual Data and Information<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/reports\/\">Reports<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/agreements-and-contracts\/\">Agreements and Contracts<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/other-artifacts\/\">Other Artifacts<\/a><\/li>\n<\/ul>\n<\/li>\n<li><strong>Project Performance Domains:<\/strong> Templates are grouped for eight performance domains as described in the PMBOK, encompassing:\n<ul>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/stakeholders\/\">Stakeholders<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/team\/\">Project Team<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/development-approach-and-life-cycle\/\">Development Approach and Life Cycle<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/planning\/\">Planning<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/project-work\/\">Project Work<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/delivery\/\">Delivery<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/measurement\/\">Measurement<\/a><\/li>\n<li><a href=\"https:\/\/pmdoc.ua\/en\/product_tag\/uncertainty\/\">Uncertainty<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><a name=\"support\"><\/a><\/p>\n<h3><strong>Support<\/strong><\/h3>\n<p>Upon purchasing the full PMBOK.Kit, buyers are entitled to a <strong>one-year support<\/strong>. This <em>&#8220;support&#8221;<\/em> includes sending all new templates and updates to the previously provided templates, irrespective of subsequent changes made to the PMBOK.Kit. Users can access and download updated documents from the <strong>&#8220;<a href=\"https:\/\/pmdoc.ua\/en\/my-account\/downloads\">Downloads<\/a>&#8220;<\/strong> section within their <a href=\"https:\/\/pmdoc.ua\/en\/my-account\/\">personal account<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<h2 style=\"text-align: center;\"><strong>The General Project Management Standard Document and Artifact Templates<\/strong><\/h2>\n<h3 style=\"text-align: center;\">Based on the PMBOK\u00ae Guide \u2013 7th Edition<\/h3>\n<p><a href=\"#what_is\">What is the PMBOK.Kit?<\/a><br \/>\n<a href=\"#how_to_use\">How to use the PMBOK.Kit?<\/a><br \/>\n<a href=\"#structure\">What is included in the PMBOK.Kit?<\/a><br \/>\n<a href=\"#support\">Support<\/a><\/p>\n<p><span style=\"color: #ff0000;\"><strong>Important Note:<\/strong><\/span> The PMBOK.Kit (7<sup>th<\/sup> edition) is currently under development. If you purchase the kit now, you will not receive all 77 templates immediately. Instead, you&#8217;ll get a 1-year subscription, which allows you to access and download new templates as they become available. Please note that we are initially developing the templates in Ukrainian. As a result, some templates in the archive might be in Ukrainian. However, translations and new templates will be made available in the <strong>&#8220;<a href=\"https:\/\/pmdoc.ua\/en\/my-account\/downloads\/\">Downloads<\/a>&#8220;<\/strong> section of your account.<\/p>\n<p>For updates, follow our channel: <strong><a href=\"https:\/\/twitter.com\/SavinAnatoly\">Twitter.com\/SavinAnatoly<\/a><\/strong>.<\/p>\n","protected":false},"featured_media":12462,"comment_status":"open","ping_status":"closed","template":"","meta":{"content-type":""},"product_brand":[],"product_cat":[415,417,392],"product_tag":[642,639,649,646,638,636,650,643,647,637,660,648,641,644,720,645,651,640],"class_list":{"0":"post-14701","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-document-kits","7":"product_cat-document-templates","8":"product_cat-gpms","9":"product_tag-agreements-and-contracts","10":"product_tag-baselines","11":"product_tag-delivery","12":"product_tag-development-approach-and-life-cycle","13":"product_tag-hierarchy-charts","14":"product_tag-logs-and-registers","15":"product_tag-measurement","16":"product_tag-other-artifacts","17":"product_tag-planning","18":"product_tag-plans","19":"product_tag-pmbok","20":"product_tag-project-work","21":"product_tag-reports","22":"product_tag-stakeholders","23":"product_tag-strategy-artifacts","24":"product_tag-team","25":"product_tag-uncertainty","26":"product_tag-visual-data-and-information","28":"first","29":"instock","30":"downloadable","31":"virtual","32":"purchasable","33":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/product\/14701","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/comments?post=14701"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/media\/12462"}],"wp:attachment":[{"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/media?parent=14701"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/product_brand?post=14701"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/product_cat?post=14701"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pmdoc.ua\/en\/wp-json\/wp\/v2\/product_tag?post=14701"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}